What is proposed?
The proposals include:
- Demolition of the existing vacant retail unit (formerly occupied by Wilko) on East Street, decked car park and car park ramp accessed from Dean Street
- Construction of 71 new homes (a mix of 1, 2 and 3 bedroom apartments), 4 of which will be adaptable/accessible for those with physical impairments
- A new replacement ground floor retail unit on East Street (245m2)
- External courtyard spaces and roof terraces, providing outdoor amenity space for residents
- 114 indoor cycle storage spaces for residents
- Pedestrian access to the building from Dean Street and East Street
How will the proposals benefit Bedminster?
Housing affordability is a problem in Bristol, with house prices rising faster than nationally and much faster than average incomes. The cost of the median home in Bristol is nearly ten times higher than the annual earnings of lower income households. There is therefore an urgent need to provide new homes, and make the most of previously developed land to do so.
The plans will regenerate a currently disused site and provide much needed new homes in a location close to local services and retail, within walking distance of Bristol City Centre.
In addition, the proposals will result in a significant improvement to the visual attractiveness of East Street, Dean Street and Dean Lane, turning an existing concrete car park deck and ramp facing Dean Lane into an active frontage to complete the streetscape.
The plans will also see a financial contribution towards local infrastructure (as determined by Bristol City Council).
Find out more about the plans
You can find the site location on our interactive site location map, using the place search bar to see where you work, live or visit regularly in relation to the proposed regeneration site.
Visit the Find out more page to see the proposed floor plans, street elevations and artist's impressions of how the new building could look, as well as read more detail about the various local issues that we have considered in formulating our proposals.
Have your say
Once you have had a chance to have a look at the site plans and read more what what is proposed, please complete our short feedback form to let us know what you think of the proposals.
Please respond to our consultation before Sunday 9th August 2026. All of the comments that we receive will be considered by our design team before the plans are finalised and a planning application is submitted to Bristol City Council.
Key project milestones
Community engagement
July 2026 to August 2026Local residents are invited to comment on the plans by visiting this website.
Feedback analysis
August 2026Every comment that we receive will be analysed and considered by the design team before the plans are finalised.
Planning application
September 2026One feedback has been analysed and the plans finalised, a planning application will be submitted to Bristol City Council. Local residents will be invited by Bristol City Council to comment again at this stage.